top of page

TECHNICAL REPORT 2

The purpose of this report is to provide a detailed analysis of the various gravity and lateral loads experienced by this building. The report will comprise of detailed hand calculations, spreadsheets and other information to facilitate the understanding of the loads in Syntra Towers.

​​​​This page was last updated by Tobi Jewoola and is hosted by the AE Department © 2015. Proudly created with Wix.com

  • linkedin-square
USER NOTEWhile great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐inprogress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Tobi Jewoola. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.
bottom of page